WWTP UPGRADE PROJECT

 

The Wastewater plant upgrade began in the spring of 2011 and has not stopped.  Contractor is Pizzagalli Construction Company and design by Hoyle, Tanner and Associates, both  from the Burlington, Vermont area.

 

Updated photos from April 19

 

Above, a sample of the new control building finish.  To be foam insulated between.

 

Above left, access thru the plant is tight with all the work that is happening.

 

Left, piles for the second primary settling tank and new digester.

 

PAVEMENT CONDITION MAP

 

All paved Town roads in Brattleboro were just recently rated for pavement condition.  Go to the GIS and Mapping page for links to this years maps and maps from two years ago.

 

Our 2012 Water Quality report has been mailed to all billed customers.

If you did not receive one, Read it Here

ADVERTISEMENT FOR BIDS

 

Separate sealed BIDS for the construction of the Spring Tree Pump Station upgrades including furnishing and installing triplex, dry pit submersible pumps, a channel mounted grinder, associated electrical, mechanical work and site work, interior piping, a new underground propane storage tank and associated piping, paving, fence repair, maintenance/protection of existing utilities and miscellaneous appurtenant work will be received by the Town of Brattleboro (Owner) at the office of the Town of Brattleboro, 230 Main Street, Brattleboro, VT 05301 until 1:30 PM, (Prevailing Local Time) June 12, 2012, and then at said office publicly opened and read aloud.

 

Read the entire ad here (pdf)